Last updated:

Downstairs holds 75°F and the bedrooms above it never get there. Maybe there’s a brown ring growing on the ceiling under the attic unit too. In a two-story house with two systems, the first question is which one is failing and why.

Sweet Olive installs and replaces ducted air-source heat pumps in homes across Timberlane and the rest of our service area. Timberlane is unincorporated, so the permit goes to Jefferson Parish even when the mail says Gretna. On the first visit we look at every system in the house, the attic air handler and its drain pan, the ducts on each floor and the panel. You get a written estimate that prices each system as its own scope.

If the upstairs system still runs and you want to know how long it has, start with an inspection. If it is failing, the replacement page walks through the decision, and the repair-or-replace guide helps you weigh it.

What an upstairs replacement in Timberlane looks like

Two systems, one failing, an attic reached by a pull-down stair and a stain on a bedroom ceiling: how a Timberlane replacement stays to one floor.

New horizontal air handler on a platform seen from the pull-down stair of a Timberlane attic
Location
Timberlane, Jefferson Parish
Home
Two-story home, about 2,800 sq ft, four bedrooms, two systems
System
Nominal 2-ton two-stage heat pump for the upstairs
Scope
Upstairs system only; downstairs system kept
Air handler
Horizontal, in the attic over bedroom ceilings
Drain safety
New secondary pan and float switch
Line set
45 feet, new, in a cover on the outside wall
Project price
$8,600
Duration
2 working days

The setting

Two floors, two systems

The house is a two-story home in Timberlane, about 2,800 square feet with four bedrooms, and each floor has its own heat pump. The upstairs system is the older one: its outdoor unit trips off on hot afternoons, and a brown ring has spread on a bedroom ceiling under the attic air handler. The downstairs system still runs well.

The decision

Replace the floor that is failing

Replacing both systems at once was the alternative. The downstairs unit tests sound, so we price the upstairs one alone and leave the other for later. The load calculation for the second floor supports a nominal two-ton, two-stage heat pump. The duct test finds one loose branch to the bonus room; the rest of the upstairs ducts stay.

Startup recordPressure test heldMicron gauge: dryCharge weighed inAirflow and staticDrain and float switchStages and backup heat
The startup lines we check and record before the upstairs system is handed over.

The work

Through a pull-down stair

The attic opening is a pull-down stair, so we choose a horizontal air handler that fits through it and set it on a platform over a new secondary pan with a float switch. The rusted old pan comes out with the old unit. A new 45-foot line set runs up the outside wall in a cover, brazed under nitrogen, pressure-tested and evacuated before any refrigerant goes in.

The handover

A dry ceiling and a cooler floor

We reconnect the bonus room branch with mastic, set the upstairs thermostat, test the float switch by lifting it, and record airflow and static pressure. Jefferson Parish inspects after the work. The aim is an upstairs that keeps pace with the downstairs, and a drain that shuts the system off before water reaches a ceiling.

One system or both?

Two systems wear out on their own schedules, and we price them that way.

The same heat pump with the vine cut back and the coil rinsed clean
Checking an outdoor unit's electrical connections with the service panel removed.

Testing each one

Two systems in one house do not always fail together. We test each one: the outdoor unit’s electrical parts, the refrigerant readings and the air handler. The newer system may only need maintenance, while the older one needs replacing. Your estimate prices them as two separate scopes, so you can do one now and plan the other.

Sizing the upstairs on its own

The upstairs carries more of the summer load than its floor area suggests, because it sits under a hot attic. We run the room-by-room load calculation (ACCA Manual J) for that floor alone, rather than copying the old nameplate. The sizing guide shows the calculation.

When the air handler sits above a bedroom

Attic equipment over finished ceilings needs drain safety and a way in.

Pan, float switch and drain

An attic air handler makes water all summer. We set it over a secondary pan with a float switch that shuts the system down if the main drain backs up, so the overflow never reaches the bedroom ceiling. Connections are sealed with mastic, and we test the switch at startup by lifting it.

Getting equipment into the attic

Many attics are reached through a pull-down stair. We measure that opening and the path to the platform on the first visit, then choose an air handler that fits through. The installation process guide shows how the work days run.

New horizontal air handler on the same Broadmoor attic platform, the flue removed
An air handler with its condensate line and trap visible at the base.

Ducts on the hot side of the house

Upstairs ducts run through the attic, the hottest place in the house on an August afternoon. A loose branch there loses cold air before it reaches the room, so we test those runs for leakage and static pressure before we plan to reuse them. The ductwork guide explains the tests, and loose or crushed runs go on your estimate as ductwork repair.

Permit, mailing address and electric account

Timberlane's paperwork follows the parish, not the post office.

Timberlane is a compact unincorporated community of about 1.5 square miles, and many of its streets carry Gretna mailing addresses. Heating and cooling work here is filed with the Jefferson Parish Building Regulatory Division before the work, and the parish inspects afterwards. Gretna, on the other hand, is its own city with its own permit office, and so is a mailing address inside its limits. Your estimate states who obtains the permit. The permit guide compares the offices.

Timberlane homes are generally on Entergy Louisiana accounts. The Energy Smart rebate belongs to Entergy New Orleans accounts, so we confirm your account before any incentive comes into the budget.

New heat pump on a raised steel stand against the same Estelle back wall
An outdoor unit on a level pad with its disconnect, the part of the job an inspector sees first.

Pricing a Timberlane replacement

Each system is a line of its own.

Sweet Olive's typical range for a residential ducted heat pump replacement is $4,250 to $11,750. We set your price after the site visit and write it into your estimate line by line, with each system and its attic work shown separately.

What moves a Timberlane price

  • One system or two. Each has its own equipment, line set and startup.
  • Attic access. The opening, the platform and the air handler size that fits.
  • Drain safety. A new secondary pan and float switch over a finished ceiling.
  • Line-set length. Upstairs units often need a longer run down the outside wall.
  • Ducts. Reconnecting a branch, or replacing runs that fail the test.